The process evaluation is based on interviews from nine people in Doncaster, alongside the Sport England personnel who has been linked with Doncaster since January 2018. A series of interviews were led by a facilitator and a graphic illustrator, who drew the comments and feelings expressed during the sessions; most of which lasted 30-45 minutes.

After the interviews, the graphic illustrator has produced a 'storybook' under the common themes, and this and be used alongside a short written report

  • Doncaster LDP Process Learning: April 2018 - September 2018 (PDF, 603 Kb)

    This report has been pulled together with partners in a number of different ways.
    Process learning take place over 2, 6 month periods throughout the year. This report summarises what has been happening, what is changing, Why that matters and what we have learnt.

  • Doncaster LDP Process Learning: October 2018 to March 2019 (PDF, 332 Kb)

    This report has been pulled together with partners in a number of different ways throughout March 2019.
    Process learning take place over 2, 6 month periods throughout the year. This report summarises what has been happening, what is changing, Why that matters and what we have learnt.

  • Doncaster Local Delivery Pilot: Process evaluation April to September 2019 (PDF, 1.2 Mb)

    This report has been pulled together with partners in a number of different ways throughout March 2019.
    Process learning take place over 2, 6 month periods throughout the year. This report summarises what has been happening, what is changing, Why that matters and what we have learnt.

  • Baseline Report Final (PDF, 2.7 Mb)

    CFE are undertaking a process and outcome evaluation of the first two years of the Doncaster LDP to understand ‘what’ happens as a result of the pilot and ‘how’ and ‘why’ change occurs, especially among the inactive, people on low incomes and children and young people. The evaluation will inform how the Doncaster LDP evolves, as well as contributing to the national evaluation, producing evidence to help the LDP to understand how they can achieve whole system change for the lasting benefit of local people. This report summarises the baseline position for the Doncaster LDP, describing the outcomes identified as priorities for the LDP so far.

  • Method review LDP evaluation (PDF, 430 Kb)

    The paper summarises the proposed method for the main stage of CFE Research’s evaluation of the Doncaster Local Delivery Pilot (LDP).

  • Theory of Change FINAL (PDF, 474 Kb)

    The Theory of Change outlines both system and population outcomes for Doncaster as a whole (that is, all Doncaster Residents).